albury wodonga amateur radio club

VK2RAY 15th August

Erwin checks the 70cm cavities before we bring up the repeater on it’s new frequencies. We replaced the network cable, power injection system. Replaced and rerouted the microwave link cabling, moved the LV dc switching, mounted the ethernet switch, added battery temperature compensation, added a dedicated battery sense wire for the charge controller and did some improvements to the telemetry side plus got the 70cm repeater and cavities mounted in the rack and nicely cabled up.

Thanks Erwin and Ron. A pleasure working with you gents with such good grace, humour and experience.

Contributed by Ross VK2DGY